Residential development of 51 residential units on a 1.99 hectare site (1.83 development area), comprising the following two storey dwellings

• 4 no. four bedroom detached dwellings
• 4 no. four bedroom semi-detached dwellings
• 8 no. three bedroom semi -detached dwellings
• 7 no three bedroom mid terraced dwellings
• 10 no three bedroom end of terrace
• 6 no two bedroom end of terrace dwellings
• 7 no two bedroom mid terrace dwellings
• 1 no. two bedroom detached dwelling, and
• 4 no one bedroom maisonettes over two storeys and all associated site development works including ESB substation, car parking, fencing, boundary walls, foul and surface water drainage including a pumping station, bicycle parking, bin storage, landscaping and amenity areas and a revised vehicular access including the setting back of the existing front boundary wall.

To find out more details on this Residential Development in Laois Applied for on 25th January 2024 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Laois


Address:
The Rookery

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL