The development will consist of:

1. Refurbishment works to protected structure no. 163 SE in the Sligo County Development Plan 2017-2023, The work will include internal modifications to facilitate ground floor entrance lobby and commercial space circa 213m2. Change of use at first and second floor level from commercial to residential use creating 6 no. 1 bedroom apartments and 2 no. 3 bedroom apartments including elevational upgrade works.

2. Demolition of existing rear extensions circa 1,450 m2 forming part of protected structure no. 163 SE in the Sligo County Development Plan 2017-2023.

3. Proposed 4 Storey rear building linked to the protected structure to accommodate 9 no.1 Bedroom apartments, 19 no. 2 bedroom apartments, lift and access stairs and associated circulation space.

4. ESB Substation building cicra 24m2

5. Single Storey refuse and storage building circa 61m2

6. Vehicular access via existing Abbey Street car park entrance,

7. All surface car parking, landscaping and associated site works and service connections.

To find out more details on this Residential Development in Sligo take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Sligo


Address:
6 Teeling Street

Stage:
Plans Refused


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL