19 Apr 2024
Bramble Apartments (Block 4): Construction of a 4 storey building comprising of a montessori facility and a childcare facility on ground floor (grey box), and 30 apartments above at Tyrrelstown Square, Hollywood Road, Dublin 15.
14 December 2023
Construction of a new 3 storey apartment building containing 3 no. apartments at Kilmartin (BZ03)
24 November 2023
Construction of 33 No. 2 storey houses, and associated site works (Zone 6,9 & Part 10)
Construction of 84 No. 2 storey houses, and associated site works (Zones 11-20 & Part 10)
Construction of 25 No. 2 storey houses, and associated site works (Zone 7 & 8)
20 Sep 2023
Construction of 30 no. 2 storey houses, and associated site works. (Zones 11,19 & 20)
Construction of 31 no. 2 storey houses, and associated site works. (Zones 16,17 & 18)
Construction of 22 no. 2 storey houses, and associated site works. (Zones 13 & 15)
01 Sept 2023
– Construction of a new 3 storey apartment building containing 3 no. apartments at Hollystown.Phase 2 – Apartment Block BZ01
– Construction of a new 3 storey apartment building containing 3 no. apartments. Apartment Block BZ02
– Construction of 36 no. 2 storey houses, and associated site works. (Zones 10,12,14,21 & 22)
24 Aug 2023
Construction of a new 3 storey apartment building containing 3 no. apartments at Hollystown
Strategic Housing Development
The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows:
1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments.
2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows:
Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor.
Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces.
Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces.
Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor.
External communal amenity space is provided at ground podiumterrace levels throughout the scheme
A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site.
Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the nonresidential activity.
3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course.
4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location.
5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park.
6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development.
To find out more details on this Residential Development in Dublin Started on 24th August 2023 take the free trial here.