9 April 2024
Construction of a 4 storey apartment block over basement car parking
Permission for development at a site of approximately 0. 477 ha. The demolition of 2 no. Two-storey habitable dwellings and associated outbuildings/structures (totalling 543 sq m gross floor area); and the construction of an apartment building (3,502 sq m gross floor area) of 4 no. Storeys over basement parking in height (totalling 5 no. Levels) to consist of:
28 no. Residential units (6 no. One bedroom apartments, 14 no. Two bedroom apartment and 8 no. Three bedroom apartments); basement car park and vehicular access ramp (incorporating 43 no. Car parking spaces, 32 no. Bicycle parking spaces, and a communal waste storage area (46 sq m); and associated entrance lobbies, circulation areas, lifts, stairs, internal plant and private amenity spaces.
The permanent closure of the current vehicular and pedestrian access from the neighbouring residential development; the permanent closure of 1 no. Existing vehicular access and 1 no. Dedicated pedestrian access from the n11 stillorgan road;upgrade and enchancement of 1 no. existing ‘Funchal’ vehicular access from the N11 Stillorgan Road, to provide the primary vehicular and pedestrian access to the proposed development, along with two new dedicated pedestrian entrances from the N11 Stillorgan Road;
Boundary treatments, hard and soft landscaping, including a playground, internal vehicle and pedestrian circulation routes, services (including 1 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level.
To find out more details on this Residential Development in Dublin Started on 9th April 2024 take the free trial here.