(1) 34 no. Residential units with the breakdown as follows
(a) 14 no. Semi- detached houses (3 bedroom units)
(b) 12 no. Apartments (12 no. 2 bedroom units)
(c) 8 no. Teraced houses in 2 no. Teraced of 4 (2 bedroom units)
(2) New site entrance, accessed from the existing r231 public road
(3) Passively supervised open space amenity areas throughout the proposed scheme
(4) Childrens playground area located centrally within the proposed scheme
(5) New connection into existing public foul sewer
(6) New connection into existing public storm sewer
(7) New connection to public watermain
(8) And all associated site development works.
To find out more details on this Residential Development in Donegal Applied for on 21st December 2023 take the free trial here.