16 Dec 2024
Block 1 – Construction of a new three storey apartment building, consisting of 4no. 2-bedroom apartments and 4no. 3-bedroom maisonettes, at numbers 01-08 of the proposed site.
Block 2 – Construction of a new two storey apartment building, consisting of 4no. 1-bedroom apartments, at numbers 09-12 of the proposed site.
Block 3 – Construction of a new two storey apartment building, consisting of 4no. 1-bedroom apartments, at numbers 19-22 of the proposed site.
Block 4 – Construction of a new two storey apartment building, consisting of 4no. 1-bedroom apartments, at numbers 23-26 of the proposed site.
Block 5 – Construction of a new two storey apartment building, consisting of 4no. 1-bedroom apartments, at numbers 35-38 of the proposed site.
27 Sep 2024
Construction of 36no. houses and all ancillary site works.
(1) Construction of 56 residential units which will include (a) 26 number three-bedroom two-storey semi detached dwellings, (b) 16 number 2 bedroom two-storey terraced dwellings (c) two blocks of duplex units with duplex block 1 consisting of four number 2 bedroom ground floor apartments and four numbeer three bedroom duplex dwellings above and a duplex block 2 consisting of three 2 bedroom ground floor apartments on ground floor level and three number three bedroom duplex dwellings above; (2) construction of all access roads, pedestrian footpaths and pedestrian crossings including the creation of a new access off the adjoining access road; (3) provision of on-site public lighting to serve the proposed development; (4) construction of all public open space amenities including children’s play area and landscaping features; (5) provision of ‘homezone’ areas to the residential areas of the proposed development; (6) all boundary treatments, including erection of boundary fences and walls.
To find out more details on this Residential Development in Donegal Started on 27th September 2024 take the free trial here.

