The proposal will consist of the construction of a Mixed Tenure Housing Development of 635 no. residential units (comprising 383 no. Affordable units, 129 no. Social units and 123 no. Private units).
The residential development will consist of 434 no. houses (1 no. 1-bed, 2 no. 2-bed; 407 no. 3-bed; 24 no. 4-bed); 165 no. duplexes (17 no. of which are live-work units), (1 no. 1-bed, 120 no. 2-bed, 44 no. 3-bed); and 36 no. apartments (18 no. 1-bed and 18 no. 2-bed). All residential units are provided with associated private gardens/balconies/ terraces facing to the north/ south/ east/ west.
The proposal also includes a community centre (c.627 sq.m) to be located at Elder Park; a local centre containing a creche (c.1,083 sq.m), retail/commercial units (c.475 sqm in total). An additional ground floor commercial/retail/café unit (c.105.5 sq.m) is also proposed along Main Avenue adjoining Horan’s Square. Total commercial/retail area proposed is c.580.5 sq.m. Provision of a new street network with vehicular/pedestrian/cyclist connections to adjoining public roads (Blessington Road (N81); Killinarden Heights, Hazelgrove, Horan’s Lane/Killinarden Road) and associated junction improvements and additional pedestrian/cyclist facilities. Pedestrianisation of part of Horan’s Lane/Killinarden Road through the development. Provision of 918 no. car parking spaces and 1,130 no. cycle parking spaces in total. Provision of a number of public parks and open spaces throughout the development including Elder Park, the Foothills Way, West Park and a number of urban parks and pocket parks within the proposed residential areas. Provision of an extensive ecological planting area south of the Foothills Way. Amendments to the northern portion of the existing sports facility adjoining Elder Park to facilitate new dedicated car park and new sports pitch. All associated site development works, open spaces, landscaping, SuDs features, boundary treatments, plant areas, waste management areas/bin stores, car/cycle parking areas (including EV parking), and services provision (including ESB substations). An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
To find out more details on this Residential Development in Dublin Started on 17th December 2024 take the free trial here.