Planning permission to erect 23,921. 86m2 of photovoltaic panels on a ground mounted system located on the existing green area between the taxiway and the runway and all associated site works at kerry airport plc. The development will comprise photovoltaic panels, 2. 5 mwp with ground mounted frames with all ancillary cabling and electrical infrastructure, including a new trench for duct work at the switch room situated at the front of the main carpark 1 no. Lv/mv and transformer cabin; using all temporary ways to have access to the welfare facilities at the back of the hanger number 2.

To find out more details on this Power Generation Development in Kerry Granted permission on 22nd February 2024 take the free trial here.


Address:
Kerry Airport

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL