Permission for the construction of the proposed development on agricultural land will comprise of the following; A Battery energy storage system with associated infrastructure including a new internal access road approximately 0.8km in length , a 1.6km 33kV double circuit underground cable grid connection to be permitted ballinrea Solar Farm 110kV substation (planning ref ABP-317706), to be installed in an excavated trench including underground ducting; modular office and welfare buildings, three steel storage containers and all associated site development and reinstatment works

To find out more details on this Power Generation Development in Cork Applied for on 26th February 2025 take the free trial here.


Address:
Ballinrea

Stage:
Plans Applied