Permission for development consisting of construction of a Battery Energy Storage System (BESS), landscaping works and all other associated ancillary infrastructure on lands measuring approximately 1.34Ha. in overall area within the townland of Great Island. The BESS would comprise 44no. individual battery storage units and 22no. inverter units on concrete foundations, with each battery storage unit measuring approximately 2.60m in overall height, 2.4m in width and 6.00m in overall length with heating, ventilation and air-conditioning (HVAC) units. Ancillary development consists of a 2.6m palisade perimeter security fencing and all other ancillary works. Site works to create a platform at +12.00m ASL, an internal access road, an earthen bund on the north and eastern boundaries and all other associated works, including landscaping proposals, drainage details and a temporary construction compound were granted permission under a previous planning application (Wexford County Council Ref. 20231294).

To find out more details on this Power Generation Development in Wexford Granted permission on 12th June 2024 take the free trial here.


Address:
Great Island

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL