Proposed erection of a 1MW Battery Energy Storage System Facility (BESS) including BESS control room at existing wind turbine site to store and stabilise energy supply from wind turbine.
To find out more details on this Power Generation Development in Causeway Coast & Glens Granted permission on 20th March 2024 take the free trial here.