Forlorn Road Car Park:
Construction of a new 23-space car park.
One-way entry from Forlorn Road (L7089).
Exit to Ballyteige Burrow Road (L3056).

Amenities:
2 disabled parking spaces.
4 electric vehicle charging bays.
Picnic tables.
Bike rack and repair kiosk.
Zebra pedestrian crossing.

Ballyteige Burrow Road Improvements:

Construction of a 2m wide concrete cycle and pedestrian path (west side):
Length: 325m
Starting point: Cottage Pump House
Ending point: Sofrimar Plant entrance
Construction of a 2m wide pedestrian footpath (east side):
Length: 525m
Starting point: Castle View (L30561)
Ending point: Ard na Ba Road (L30564)

Recreation Trail:

Construction of a 3m wide cycle and pedestrian trail along the drainage channel towpath.
Trail details:
Off-road gravel path: 1.78 km
Prefabricated footbridge at Sofrimar: 23 meters long
4 concrete slab farm crossing points
Stockproof fencing and gates
Culverts
Signage
Ballyburn Crossroad Car Park:

Construction of a new 22-space car park with access from Ballyteige Burrow Road (L3056).
Amenities:
2 disabled parking spaces.
4 electric vehicle charging bays.
Picnic tables.
Bike rack and repair kiosk.

To find out more details on this Carpark Development in Wexford Applied for on 17th May 2024 take the free trial here.


Address:
Ballyteige Burrow/Inish and

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL