Extension of existing car park to include proposed 600mm x 600mm mono unleaded fuel pump, proposed 10,000L underground unleaded fuel tank double skinned and proposed 10,000L underground interceptor. Proposal to include the provision of 14 additional car parking spaces with 1 metre high retaining wall to boundary. 150 x 380mm deep enviro channel with 6mm heel friendly slot to boundary (x2), reinforced concrete tanker stand 5m X 18m with connection of new storm drainage line into existing, 9no. bollards and new double gate access for fuel delivery. 13no. proposed LED column mounted floodlights to parking, fuel filling and circulation areas.
To find out more details on this Carpark Development in Armagh Banbridge & Craigavon Granted permission on 23rd September 2024 take the free trial here.