All temporary and permanent works associated with the provision and installation of corrosion prevention measures to the exposed section of steel piles (from the top of the collars to the soffit of the concrete deck) on the Blackrock Pier, Landing Pier and Wharf. The corrosion prevention system to protect the exposed sections of the steel piles above the steel collars shall be a jacket system.