Short term tourist accommodation incorporating individual holiday suites and micro camping facility within existing historic orchard. The development will consist of
a) 7 no. detached suites to accommodate 1-2 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms
b) 3 no detached suites to accommodate 1 – 6 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms
c) change of use of existing dwelling to reception area
d) refurbishment of existing dwelling to provide for a reception and lounge area with utility and toilet facilities
e) kitchen extension to existing dwelling
f) yoga space to rear of reception
g) camping area
h) bicycle shelter and barbeque area
i) alterations and improvements to existing entrance from laneway
j) secondary effluent treatment system with sand polishing filter
k) PV solar panels
l) car parking at proposed reception area and 14 car parking spaces along western boundary of site
m) permeable grass reinforced mesh pathways
n) indoor and outdoor geothermal heat pump unit
o) rainwater harvesting unit and all associated site works

To find out more details on this Sport & Leisure Development in Tipperary Applied for on 2019-09-25 take the free trial here.


Address:
Drominagh Wood

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL