The development will consist of a Battery Energy Storage System (BESS) which will include up to 9 no. containerised battery storage modules ( up to 14m length, 2.44m wide and 2.9m high) and ancillary equipment including up to: 9 no transformers (2.5m wide and 2.9m high), 7 no. power conditioning unit blocks (8m length and 1.5m wide), 1 no. power conditioning unit block (5m length by 5m wide), 9 no. switchgear units (1.5m length, 1.5m wide and 1.6m high), a sub-station container (4.5m length, 3.0m wide and 3.0m high) and all other associated site development works as required to facilitate the development. The BESS will be contained within a 0.0507-hectare site located entirely within the boundary of the existing Huntstown Power Station which is regulated by the Environmental Protection Agency through Industrial Emission Licenses P0483-04 AND P777-02.

To find out more details on this Light Industrial Development in Dublin Applied for on 2019-02-04 take the free trial here.


Address:
Huntstown Power Station

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL