The develoment proposes the demolition of the existing 5 storey over lower ground floor office developmenton the site (c.2,290 sqm, [c.15.70m high with roof plant extending to overall height of c. 18.94m]) and demolition of its lower ground floor single storey annex building (c.365 sqm – partially underground with roof car park above for 11 no. car park spaces with vehicular access from Wilton Terrace) and the construction of a new 6 storey offce development (7,024 sqm [24.05m high]) over 2 basement levels including the following elements: removal of existing vehicular access from Wilton Terrace (with future vehicular access from Baggot Street Lower via Pembroke Row); provision of 14 no. car parking spaces and 56 no. bicycle spaces together with main plant, storage areas, waste facilities and staff facilities at basement levels, ESB substation to rear (at basement-01 level); provision of cafe and office space at ground floor level and office space above; sunken rooftop plant and all ancillary development, landscaping and site works above and below ground.

To find out more details on this Office Development in Dublin Started on 2018-06-25 take the free trial here.


Address:
74-75 Baggot Street Lower

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL