Involves the provision of an asphalt batching plant including a bunded bitumen storage area (roof), 6 no. Hoppers for insertion of raw material, reclaimed asphalt pavement (rap) system, conveyor belt system and 5 no. Bitumen/fuel storage tanks. The proposed development includes the installation of a new class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22. 8m in height (12. 8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0. 82 hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (lp-1545) via the existing quarry road.

To find out more details on this Factory Development in Limerick Granted permission on 2017-12-18 take the free trial here.


Address:
Ballinleeny

Stage:
Plans Granted