An extension to existing factory along with new storage/maintenance building (348m2). Works to include the demolition of the following buildings and structures: (1) current storage building along with the workshop, (2) the decommissioning and removal of the existing septic tank which currently serves the dwelling house, (3) the part demolition of the existing dwelling house and (4) the demolition of part of the roadside boundary wall to accommodate a wider entrance. The extension measures 1140m2 including office extension, locker/toilet facilities and is attached to the existing building along with change of use for the retained part of the dwelling to a canteen for the factory. The widening of the existing public road entrance where existing dwelling house is to be removed. The construction of a new storage/maintenance/workshop building (348m2) to be located across the public roadway along with the provision of 27 no. car spaces in upgraded car parking areas in replacement of and adjacent to the old car park across from the public roadway; the provision of a covered area (shed) for bikes (12m2); the construction of a dedicated truck delivery area including a dock leveller, ramp and canopy and all ancillary site works.

To find out more details on this Factory Development in Limerick Granted permission on 2016-02-19 take the free trial here.


Address:
Ballycahill

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL