Completion of the demolition of existing dry pack and existing wood shaving collection buildings, the construction of a stress grading and machine building (7,563sq.m) incorporating welfare facilities, wood shaving collection area and new transformer station; additional timber drying facility (2,454 sq.m.), extensions to existing Dropsorter (1,462sq.m.) including dry pallet wood infeed area, culvert to existing stream, extension of existing stock yard, proposed overhead conveyor, new entrance signage, site perimeter berms, 1no. timber walling, additional lighting and all associated landscaping and site works including the relocation of transformer station expansion of settlement ponds and drainage works; and permission for the retention of 3no. timber wallings around existing machinery at their existing sawmill on a site of 25.4ha (62.77 acre). -Extension of Duration of Permission granted under Planning Reg. No. 12/5014.

To find out more details on this Factory Development in Cork Granted permission on 2017-05-17 take the free trial here.


Address:
Farran South

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL