The development will consist of 1) the demolition of the existing offices, factory buildings, yards, chimneys and ancillary accommodation on site; 2) demolition of single storey extension to the side of no. 103 Clonskeagh Road; 3) alterations to the rear boundaries only of Nos. 59-63 Clonskeagh Road and alterations to the rear and side boundaries of nos. 65,73 and 103 Clonskeagh Road; 4) the construction of 92 no. apartment units, all with balconies, terraces or roof terraces, in 4 no. apartment blocks as follows; Block 1 comprising 2 and 3 storeys over Lower Ground parking at River Level -11 no. 2 bed units, Block 2 comprising 4-storey at podium/ street level over lower ground parking at River Level- 61 no. units (15 no. 1 bed units and 46 no. 2 bed units), Block 3 comprising 2 storeys – 6 no. 2 bed units and Block 4 comprising 4 storey – 14 no units (3 no. 1 bed units and 11 no. 2 bed units); 5) 1 no. creche facility of 125.6sq.m; 6) Option A- the provision of a riverside walkway along the Dodder River extending the length of the site to Clonskeagh Bridge or Option B- landscaping only along the Dodder River extending the length of the site with no inclusion of riverside walk; 7) utilisation and widening of the existing entrance/egress beside No. 103 Clonskeagh Road and the provision of a new vehicular entrance between no. 65 & 67 Clonskeagh Road; 8) bin storage, 134 no. car parking spaces and 100 no. cycle spaces at Lower Ground/River Level to be accessed by a proposed vehicular ramp, 3 no. set down car parking spaces on the surface; and 9) improvements to existing boundary walls and all landscaping, engineering and associated works.
To find out more details on this Residential Development in Dublin Granted permission on 28th January 2015 take the free trial here.