The development consisting of:(i) Demolition of all existing out-buildings on site; (ii) Removal of two-storey rear return extensions and renovation of existing dwelling at no. 89 Cromwellsfort Road;
(iii) Construction of 12 no. Infill houses with car parking and private rear gardens (comprising 2 no. Two-storey, semi-detached 3-bed; 2 no. Two-storey (with additional attic level bedroom), semi-detached 3-bed; and 8 no. Two storey (with additional attic level bedroom) terraced 3-bed); (iv) Upgrade works to the site boundaries and vehicular access from Cromwellsfort Road with access to proposed house nos. 1-3 provided via existing lane located between no. 30 bigger road and no. 34 bigger road (v) Installation of street lighting; (vi) Surface water and foul drainage;(vii) All associated landscaping and ancillary site works necessary to facilitate the development.
To find out more details on this Residential Development in Dublin Granted permission on 19th December 2018 take the free trial here.

