The development will consist of modifications to a previously permitted mixed-use development (reg. Ref. F17a/0704; abp ref. Pl06f. 301370) to include: an additional 12 no. Apartments at the top of block a resulting in the permitted building height increasing from 6 no. Storeys (over ground) to a total of 8 no. Storeys (over ground) and the overall number of apartments increasing from 55 no. Units to 67 no. Units; changes to permitted car and cycle parking areas resulting in 78 new cycle parking spaces (increasing from 78 no. Spaces to 156 no. Spaces overall); minor elevational changes and alterations to rooftop plant enclosure and lift over-run, and associated site development works above and below ground. Vehicular access and egress will continue to be from the Old Ballymun Road to the east.

To find out more details on this Residential Development in Dublin Started on 2020-03-12 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
Lands At The Southwestern Corner Of The Junction Of Northwood Avenue

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL