The construction of a maturation warehouse facility consisting of 12 no. maturation warehouses, filling hall,ancillary buildings and all ancillary site development works. Each proposed warehouse has a gross floor area of approximately 1,570m2 and a typical ridge height of approximately 11 metres. The proposed filling hall has associated water storage tank,8 no spirit storage vats,purified water treatment plant and loading dock; ancillary buildings and structures will include a single storey facilities building; single storey fork lift charging shed; single storey sprinkler pump-house; water sprinkler tank and ESB substation. Ancillary landscaping and site development works include a package sewage treatment plant and associated percolation area; sprinkler water retention pond;a surface water attenuation pond;10 no. CCTV surveillance cameras mounted on pole; berming, landscaping, perimeter fencing and gates.Access to the proposed facility will be via a new entrance from the L5344 with provision for emergency access from the R392.The proposed development relates to the provision of an establishment to which the Major Accident Directive applies. This is a 10 year permission to enable construction works.

To find out more details on this Warehouse Development in Westmeath Granted permission on 2018-02-06 take the free trial here.


Address:
Moyvore

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL