The proposed development consists of the relocation of a permitted concrete block yard from the site of an established and permitted quarry, precast concrete manufacturing plant and block manufacturing facility located on the northern side of the r156 regional road, to the southern side of the r156, and the development of an ancillary mixing/batching plant and associated development, works and landscaping. The development will consist of a hardstanding block yard of approximately 7,700 sqm; associated mixing/batching plant comprised of an aggregate hopper and loading platform, aggregate storage and mixing shed of 111 sq m gross floor area (gfa), a batch tower of 75 sqm gfa (10. 5m above ground level), 2 no. Belt conveyers, 3 no. Storage silos and treatment lagoons; together with an internal road including a culvert under the r156 to provide vehicular and services access from the established quarry to the proposed plant, the provision of road safety barriers along the r156 and all assoc

To find out more details on this Factory Development in Meath Granted permission on 2017-08-29 take the free trial here.


Address:
Trommon

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL