Development to the rear of Shaws Pub, a protected structure, main st. , Summerhill.

(1) 8 no two bedroom residential apartment units (areas ranging from 74.9 to 85.6 sqm) arranged over 3 no 2 story blocks.

(2) Construction of a part two-storey community building to include
a childcare facility(area 2.35sqm) at ground floor level comprising 2 no play spaces, ancillary staff accommodation and outdoor play space (170sqm)2 no yoga therapy studios and ancillary accommodation (area 155.6 sqm) at first floor level, and vehicular access point from cherry court estate, on-site car parking and associated site development works.

To find out more details on this Residential Development in Meath Granted permission on 25th May 2018 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Mixed Development New Build in Meath


Address:
Rear Of Shaws Pub

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL