Internal and external refurbishment works to the chapel (954sqm). External works comprising the replacement of the high level clerestory glazing with new slim profile metal double glazing on the north, south and west elevations; the removal of associated high level storm glazing; the reconfiguration of entrance doors, steps and ramp. Internal works comprising the reconfiguration of the sanctuary and side chapels, internal re-decoration works to the walls, ceilings and floors; the provision of an underfloor heating system, upgraded cavity wall and roof insulation as part of energy upgrade works to the chapel; and all associated site development and excavation works above and below ground (this is a protected structure).

To find out more details on this Church & Community Development in Limerick Started on 2016-07-19 take the free trial here.


Address:
Priory Chapel (Church)

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL