An extension to the existing bio-medicines manufacturing facility (proposed gross floor area c. 19,116sq. M), including (i) a new part single-storey, part two-storey over basement production building, including mezzanine floors (c. 11.054sq. M and maximum height 24.45m); (ii) 3 no extensions to the existing warehouse building (c. 4,890sq. M and maximum height 18. 2m), to include a new part single-storey, part two-storey waste management and dispensing area; a new single-storey high bay warehouse; a new single-storey finished goods area; and a single storey extension to the existing link corridor to connect the proposed production building with the existing facility; (iii) a new four-storey extension to the existing administration and laboratory building, including a single-storey extension to the existing cafeteria (c. 3,100sq. M and maximum height 22. 2m); new single-storey drum store (c. 72sq. M and maximum height 6. 15m); (iv) extension to the existing on site waste water treatment.
06/10/2017: Work is due to begin later this month and is expected to take two years.
To find out more details on this Factory Development in Cork Started on 9th October 2017 take the free trial here.