Minor modifications to the previously approved Castlepook Wind Farm development comprising 14 wind turbines (An Bord Pleanala Ref. PL 04.240434, Cork County Council Ref. 11/4947). The development will consist of an increase in the maximum overall dimensions of the 14 permitted wind turbines (from 126m to 135m); substitution of two permitted guyed anemometer masts with two free-standing anemometer masts with a height corresponding to the amended wind turbine towers, which will be a maximum of 90m; realignment of the access to turbines No. T2, T4 and T10; and all associated site works, above and below ground.

To find out more details on this Power Generation Development in Cork take the free trial here.


Address:
Castlepook North

Stage:
Plans Withdrawn/Invalid