The demolition of the existing pub, house and derelict buildings on site and the construction of 17 no. residential dwellings on the site, comprised of: (i) 4 no. two-storey, four-bed, detached houses; (ii) 9 no. three-storey, three-bed, townhouses, and (iii) 4 no. apartments (consisting of 2 no. ground floor, one-bed units with 2 no. two-bed duplexes above), as well as a total of 26 car parking spaces (including proposed on-street parking spaces); private amenity space for each dwelling (rear gardens ranging from 58-227sqm for the houses and private amenity space ranging from 9-13sqm for the apartments); public open space, boundary treatments, a new public pavement, landscaping, bin storage, flood relief works (including stormwater attenuation and provision of a flood conveyance and storage area along a portion of the boundary with the River Stick) and all ancillary works necessary to facilitate the development.

To find out more details on this Residential Development in Cork Applied for on 2020-07-03 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Cork


Address:
Boulaling &

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL