Intensification of use at this site from 10,000 tonnes of WEEE and metal waste per annu to 50,000 tonnes of WEEE and metal waste per annum and installation of a second external air handling unit, (2) construct a new canopy roof (2,715m) covering to existing open yard to west side of the existing building with open sides to front (south) and rear (north) and part-open side to west side with minor modifications to feature cladding of existing building to accommodate the proposed new canopy roof (3) Weighbridge Station building (35m) to western side of the existing building with 2 No. Weighbridges (4) MV Substation Building (14m) to eastern side of and adjoining the existing building (5) New vehicular and pedestrian entrance to site from R446, including modifications to existing boundary fence and new gates and rearrangement of existing vehicle parking on the site (6) Proposed new signage including 4.0m high totem sign adjacent to main road and new plinth signage at new entrance (7) two 10,000L underground rainwater harvesting tanks to rear of site (8) Proposed minor modifications to existing underground services and all associated underground and overground site works. An Environmental Impact Statement Assessment has been prepared and will be submitted with this application. This development will also require an Industrial Emissions Licence from the Environmental Protection Agency.
To find out more details on this Light Industrial Development in Westmeath Granted permission on 12th February 2018 take the free trial here.

