Demolition of all existing buildings on site (4,209sq.m.); part demolition of the existing concrete yard; construction of a new concrete yard and the change of use from a roof tile manufacturing plant to a metal recycling facility including the provision of a metal shearing machine (max. height 12.11m), control cabin tower (max. height 14.95m), materials handler machine mounted on a 5m high plinth and 2 no. stockpiles (max. height 7m); non-ferrous metal recovery building (962sq.m., max. height 14.15m) and covered yard (1685.5sq.m., max. height 14.15m) with weighbridge; depollutant reception yard and building (917.5sq.m., max. height 8.2m) for End of Life Vehicles (ELVs),

Also including a batteries/tyre store; workshop (390.5sq.m., max height 7.625m), 20,000 ltr gas oil tank and bund and washbay; two storey office building (378sq.m., max. height 8.658m); ESB substation (40sq.m.); store room (24sq.m.); MCC room (33sq.m.); 2 no. 18m weighbridges; 1.5m internal containment walls; 31 no. car parking spaces; 4 no. lorry parking spaces; 4m high inner security fencing; new drainage works including 2 no. attenuation tanks and 2 no. oil separators;

New access off Crag Terrace including new gates and fencing and closure of existing access off Crag Avenue; all site development works and new landscaping works and boundary treatments all on a site of 2.36ha. An Environmental Impact Statement (EIS) has been prepared in respect of the Planning Application.

To find out more details on this Light Industrial Development in Dublin Granted permission on 2018-09-19 take the free trial here.


Address:
Crag Terrace & Crag Avenue

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL