Residential development consisting of 53 no. 2 storey houses on a site area of 1.58ha. which will form Phase 8A of an overall development. the proposed developments consists of 12 no. 4 bed semi-detached houses and 41 no. 2 & 3 bed terraced townhouses in 10 no. terraced blocks and includes for open spaces, car parking and for all associated site development works which consist of surface water attenuation and foul effluent to existing public sewer (using some the capacity available from a previously permitted development of 161 no. units under Reg. Refs F06A/0562 & Pl06F.219874 of which 56 no. units i.e. No.s 102-157 Cedar Place, Ridgewood, shall not be occupied until capacity becomes available as part of the Swords Waste Water Treatment Plant Phase 2 expansion). Access to the development is via Ridgewood Avenue through the Ridgewood Estate from Forrest Road and this application consists of minor modifications to house types previously permitted under Reg. Ref. F10A/0535.

To find out more details on this Residential Development in Dublin Started on 2014-02-19 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Dublin


Address:
Ridgewood

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL