development will comprise the following: (i) Intensification of livestock slaughtering activites at the existing meat plant; (ii) Demolition and removal of existing offices as required under Condition no 3 of planning permission SA/140210; (iii) Construction of 210m2 of new offices, staff welfare and storage facilities at the location of the demountable structure referred to in (ii) above; (iv) Change of use of an existing farmhouse from residential use to office use (153m2); (v) Construction of 112m2 of additional lairage facilities; (vi) Construction of a 18m2 green offal processing room abutting the main factory building; (vii) Construction of an external gantry to support a stomach press (20m2); (viii) Construction of a 4m2 pumphouse; (ix) Addition of 5 no. new ancillary car parking spaces. An Environmental Impact Statement (EIS) will be submitted with the planning application to the Planning Authority. The application is in respect of an activity which requires an Integrated Pollu

To find out more details on this Factory Development in Meath Granted permission on 2015-01-22 take the free trial here.


Address:
Painstown

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL