Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows:
(A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area.
(B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey.
(C) 21 duplex apartments in 2 3-storey buildings.
(D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores.
(E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7).
(F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths.
(G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive.
(H) Provision of surface water and underground attenuation and all ancillary site development work.

To find out more details on this Residential Development in Dublin Granted permission on 20th April 2020 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Apartments New Build in Dublin


Address:
Citywest Road And Magna Drive

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL