The development will consist of 1) permission for the construction of 47 no. Dwellings to include 18 no. Two storey semi-detached dwellings, 8 no single storey semi-detached dwellings, 1 no single storey detached dwelling, 2 no. Two storey blocks comprising 8 no dwellings and 3 no. Two storey terrace blocks comprising 12 no. Dwellings and site development works including surface water and foul water drainage,roads,footpaths,public open space. The development will include works to complete the housing development previously approved under permission 04/5438. 2) retention permission is sought for the existing foul pumping station and alterations to previously approved drainage layouts.

To find out more details on this Residential Development in Carlow Started on 2019-02-18 take the free trial here.

With full details of over 2,500 Residential Housing Projects worth in excess €11bn that are Granted Permission and ready to go Building Information Ireland is the best source of business intelligence for the Construction sector.
The intuitive and richly featured application is suitable for businesses of all sizes. 
 
The Mobile friendly app is ideal for and built for reps on the road. 
 
Take the free trial today and unlock the potential.
 
Houses New Build in Carlow


Address:
Rivercourt

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL