The development will consist of a physical extension of c. 300 sq.m to the existing electricity substation compound and will include: (a) Site clearance works including removal of: 1) 3 No. MV poles and associated overhead lines; 2) Existing MV busbar and associated electrical equipment; 3) Existing 38 kV busbar and associated electrical equipment; 4) Existing 3 No. 38 kV / MV transformers; 5) Existing chainlink fence and entrance gates; 6) Demolition of existing single storey control building (c. 16 sq.m); and 7) Existing trees and vegetation along south and west site boundaries. (b) Provision of new electrical plant and equipment including: 1) No. prefabricated 38 kV GIS module and foundation (c. 31m2 and c. 5.2 m high); 2) 1 No. prefabricated MV GIS module and foundation (c. 32m2 and c. 4.7 m high);
3) 1 No. prefabricated Control Room module and foundation (c. 32m2 and c. 4.7 m high); 4) 2 No. 38/20 kV 10 MVA transformers and associated bunds (c. 15m2, 3.8 m high ea.); 5) Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and 6) site development works including provision of bollards, lighting; surfacing; internal access roads; new fencing and gates; and provision of site services including drainage; and all other ancillary works.

To find out more details on this Power Generation Development in Meath Granted permission on 22nd February 2024 take the free trial here.


Address:
Existing ESB Athboy 38Kv Substation

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL