The development will consist of a 114 megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ?electricity generating station?. The electricity generating station will comprise of 2 no. Open cycle gas turbine (ocgt) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: ? above ground installation (agi) to facilitate connection to the gas network, with compound area of 1,600 m?; ? 3 no. Gas agi buildings; ? admin & welfare block; ? electrical substation with area of 3,800 m?; ? 1 no. Substation building; ? electrical building; ? 3 no. Secondary fuel storage tanks with volume of 3,600 m?; ? fire water storage tank & pumphouse; ? sludge tank & pump house; ? resurfacing, repair and improvement of existing site entrance; ? replacement bridge; ? gatehouse; ? internal acc
To find out more details on this Power Generation Development in Mayo Granted permission on 2nd January 2024 take the free trial here.