A 10 year planning permission. The development will consist of a grid system services facility within a total site area of 3. 5 hectares. The proposed development will have a projected life span of 30 years. The development will include 1 no. Single storey electrical substation building, 1 no. Customer substation control and switch rooms, up to 20 no. Electrical inverter/transformer station modules mounted on concrete plinths, up to 80 no. Containerised battery blocks on concrete support structures and associated heating, ventilation and air conditioning units (hvac units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates and perimeter security fencing up to 2. 6m palisade fencing, cctv security monitoring system, landscaping works and all associated ancillary infrastructure.

To find out more details on this Power Generation Development in Offaly Granted permission on 17th April 2024 take the free trial here.


Address:
Derrynagall or Ballydaly

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL