PROTECTED STRUCTURE: permission for a material change to the Chief Mechanical Engineers building within Inchicore Railway Works. A protected structure (Dublin City Council Development Plan 2022-2028, RPS No. 8853). The proposed works to consist of the energy retrofit of the existing building including the internal insulation of the roof and the internal drylining of the external walls, the introduction of internal secondary glazing and a mechanical ventilations system. The proposed works to take place at larnr?d Eireann, Inchicore works, Inchicore, Dublin 8, D08 K6Y3.
To find out more details on this Transport Development in Dublin Granted permission on 22nd January 2024 take the free trial here.