Tender for an Enablement Contract at Smooth Point, Killybegs, Co. Donegal to included the following works: Removal of an existing stockpile of inert clay (circa 13,000 cublic metres). Environmental dredge of approximately 22,500 cubic metres of material. Stabilisation (dewatering) of the dredge material with Killybegs Fishery Harbour Centre. Removal of stabilised material from site for potential re-use as an engineering material.
To find out more details on this Light Industrial Development in Donegal take the free trial here.