Provision of 25No. electrical vehicle (‘EV’) charging units, erection of 1No. transformer room, 1No. High Voltage (‘HV’) switchroom, 1No. combined Low Voltage (‘LV’) switch room, transformer and storage building, 1No. combined switchroom and transformer building, and 1No. combined LV switchroom, transformer and staff facilities building, along with associated site infrastructure (including: cable trays; parking bollards; bus wheel stops; vehicle protection barriers, Armco barriers and lighting units), minor alterations to existing bus parking area to facilitate modification of existing pedestrian walkway and reconfigured bus parking bays, and all associated site works.
To find out more details on this Power Generation Development in Belfast Granted permission on 9th August 2024 take the free trial here.