Permission for the construction of a 300-kilowatt ground-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of existing hard-standing to the east of the main building on site. The array will have a maximum height of 3 metres above the existing ground level.
To find out more details on this Power Generation Development in Cork Granted permission on 2nd January 2024 take the free trial here.