Retention Planning Permission for Prefabricated Office (c. 20.0m2), Prefabricated Office (c. 24.0 m2), Circular Horse Exerciser 14m (c.163m2), Long Stable Block (c. 830 m2), 4 No. Loose box stables (c.52.83m2) and 1 No Tack Room building with feed storage area (c.82.8m2) and Planning Permission to install 100kW (c. 472m2) of Roof Mounted Solar PV Panels on the long Stable Block and all associated works.
To find out more details on this Power Generation Development in Dublin Granted permission on 15th November 2024 take the free trial here.