Installation of ground mounted solar panels with an overall area of 108.52 sqm. The panels are to be grouped in three banks of 4.55m x 7.95m each and are to be located on the rear garden of the existing farm house, adjacent to the farm yard.

To find out more details on this Power Generation Development in Kildare Granted permission on 15th April 2024 take the free trial here.


Address:
Coolaght Lodge

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL