The development will consist of: The development and operation of a c.13.8MW solar photovoltaic (PV) farm at a 21.25ha site location off the L2760. The application seeks a 10-year permission with an operational lifetime of 35 years and includes:Approximately 37, 000 solar photovoltaic panels on ground mounted metal frames including string inverters mounted to the rear of the panels, with a maximum table height above ground of approximately 2.7 metres; 1 no. 38kV substation including 1 no. MV switch room, 1 no. IPP control room, 1 no. ESB switch room and associated electrical infrastructure;3 no. transformer units; Underground cabling and ducting; 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; Perimeter fencing;CCTV; Construction and operational access provided from existing site entrance off the L2760;Internal tracks, site landscaping and all associated site enabling and site development works
To find out more details on this Power Generation Development in Cork Applied for on 5th December 2024 take the free trial here.

