A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19. 0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no. ), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no. ), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no. ), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no. ), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbi
To find out more details on this Power Generation Development in Mayo Granted permission on 20th February 2024 take the free trial here.