Permission for (1) Construction of a new hardstanding compound to the North of the existing 38Kva Substation. The compound to be secured with 2.9m high palisade fence, (2) Installation of 5MW (5x1MW) of Hydrotreated vegetable oil (HVO) stationary standby generators for emergency electricity generation, each generator is enclosed in a weatherproof container (2.8m high x 0.8m Long x 5.0m wide). (3) Installation of 2 no. transformers within the compound and associated cabling. (4) Extension to the existing concrete roadway to access the compound. (5) All associated site works. The development relates to an activity in relation to which a revised Integrated Pollution Prevention and Control Licence is required