11 Feb 2019 Proposed development at this stage of the works includes the construction of the internal palisade fence, new palisade gate to the public roadway, new temporary construction stone road, diversion of existing MV cables, demolition of existing equipment plinths and building and site investigation works for the design of the GIS building only. Note only building works is the demolition of the existing MV building

Permission for development which will consist of: the construction of a new twelve bay 110kv gas insulated switchgear (gis) building located entirely within the southern portion of the existing galway 110kv substation. The proposed gis building will measure approximately 700 sq. M. With a height of approximately 15 meters; associated development includes: the replacement of three existing 110kv overhead line towers within the substation with three line cable interface masts (lcim) proximate to the existing towers to facilitate access of existing transmission circuits to the proposed gis building by means of underground cables; provision of a temporary internal access route, and vehicular access gate at the south-eastern boundary of the existing substation site to facilitate construction activities. This internal access route and gate will be removed and the substation boundary reinstated upon completion of the development; improvements to the existing vehicular access arrangements.

To find out more details on this Power Generation Development in Galway Started on 11th February 2019 take the free trial here.


Address:
110KV Electrical Substation

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL