30 Apr 2024 An Bord Pleanala Grant Permissions with Conditions

The development is similar to that previously granted under An Bord Pleanala reference number PL04.QD.0010 and will consist of the deepening of the existing quarry extraction area by 2 no. 15 meter benches from -20m OD to -50m OD, along with minor amendments to the permitted quarry layout (plan file ref. no’s: S/02/5476 and ABP Ref. PL04.203762 and ABP Ref. PL04.QD.0010) all within the existing permitted quarry footprint and the continued use of the existing water management system ( settlement pond/infiltration pond system, permitted under PL04.QD.0010) for the life of the proposed development, all within an application area of c. 12.6 hectares. An extraction capacity of up to 375,000 tonnes per annum is sought to provide the applicant with the ability to respond to demand aggregates for large infrastructure projects in the region. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).

To find out more details on this Quarry Development in Cork Granted permission on 30th April 2024 take the free trial here.


Address:
Rossmore

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL